|
|
|
|
|
|
|
Hydraulic test cabinet |
|
Bottom of cabinet has oil reservor and power supply |
|
|
|
|
|
|
|
|
|
|
Cabinet with pipe & tubing |
|
showing CSC abilities to install mechanical systems in a workmanship manner. |
|
|
|
|
|
|
|
|
|
|
Pneumatic panel with plastic tubing |
|
Built to client specification. Tubing had to be installed without sharp bends. |
|
|
|
|
|
|
|
|
|
|
Free standing double door starter cabinet. |
|
View of inside |
|
|
|
|
|
|
|
|
|
|
Free standing double door starter cabinet. |
|
View of front. |
|
|
|
|
|
|
|
|
|
|
Semi-truck terminal |
|
Rear side view. |
|
|
|
|
|
|
|
|
|
|
Semi-truck terminal |
|
Front-side view |
|
|
|
|
|
|
|
|
|
|
Chemical Metering cabinet |
|
Showing st. stl. tubing inside cabinet. designed by our staff. |
|
|
|
|
|
|
|
|
|
|
Chemical Metering cabinet |
|
view of tubing assembly on top of enclosure |
|
|
|
|
|
|
|
|
|
|
Large wall control panel |
|
This is an old picture of time gone bye |
|
|
|
|
|
|
|
|
|
|
Water test panel and sink. |
|
Built to order for Duke Energy |
|
|
|
|
|
|
|
|
|
|
Water test panel and sink. |
|
view of analyzers |
|
|
|
|
|
|
|
|
|
|
Water test panel and sink. |
|
overall view of panel. our staff made all the cutouts in the st. stl. for the tubing to be assembled on site. |
|
|
|
|
|
|
|